• Vai al sito in italiano
SAP SYSTEM

BODY FILLER

Body Filler
BODY FILLER

PRIMER

Primer
PRIMER

WATER BASE

Water Base
WATER BASE

CLEAR LACQUER

Clear Lacquer
CLEAR LACQUER

SPAP DRYTRON

SPAP drytron
SPAP DRYTRON
PRIMER
SAP SYSTEM EXAMPLE OF A JOB OF 2 PANELS
CONVENTIONAL SYSTEM EXAMPLE OF A JOB OF 2 PANELS
spap 2 minutes
2:00 minutes
APPLICATION OF THE FIRST COAT

The undercoat can be applied with the same process, time and quality, either spraying or roller application. Application of the first coat spraying or roller. The time required for the application is about 2:00 minutes.
convenzionale 2 minutes
2:00 minutes
APPLICATION OF THE FIRST COAT

Application of the first coat spraying. The time required for spraying is about 2:00 minutes. In traditional cycle is not possible to use the roller with the same process and product.
spap 2 minutes
2:00 minutes
FLASH-OFF

Drying is immediately performed by the robot upon completing the application, at a speed of approx. 80 linear cm per minute. The time required for drying is about 2:00 minutes.
conventional 05 minutes
05:00 minutes
NATURAL FLASH-OFF

Waiting time required for flash-off before applying the next coat. The time required for flash-off is about 5:00 minutes.
spap 2 minutes
2:00 minutes
APPLICATION OF THE SECOND COAT

Application of the second coat spraying or roller. The time required for the application is about 2:00 minutes.
conventional 2 minutes
2:00 minutes
APPLICATION OF THE SECOND COAT

Application of the second coat spraying. The time required for spraying is about 2:00 minutes.
spap 3 minutes
3:00 minuti
DRYING

Drying is immediately performed by the robot upon completing the application, at a speed of approx. 60 linear cm per minute. The time required for drying is about 3:00 minutes
conventional 5 minutes
5:00 minutes
NATURAL FLASH-OFF

Waiting time required for flash-off before applying the next coat. The time required for flash-off is about 5:00 minutes.
spap 2 minutes
2:00 minutes
APPLICATION OF THE THIRD COAT

Application of the third coat spraying or roller. The time required for spraying is about 2:00 minutes.
conventional 2 minutes
2:00 minutes
APPLICATION OF THE THIRD COAT

Application of the third coat spraying. The time required for spraying is about 2:00 minutes.
spap 3 minutes
3:00 minutes
DRYING

Drying is immediately performed by the robot upon completing the application, at a speed of approx. 60 linear cm per minute. The time required for drying is about 3:00 minutes.
conventional 24 minutes
24:00 minutes
DRYING

Drying is carried out using traditional methods, with an electric IR heater or a drying oven. The time required for drying is 24:00 minutes (2 potitioning, 12:00 minutes each one).
spap 12 minutes
12:00 minutes
SANDING

Sanding is carried out immediately once the drying is complete. The time required for sanding is about 12:00 minutes.
conventional 16 minutes
16:00 minutes
FINAL SANDING

Undercoat sanding. The time required for sanding is about 16:00 minutes
spap total 26 minutes
26:00 minutes
TOTAL TIME

The total time for the entire undercoat repair cycle usin g the SPAP system is about 26:00 minutes.
conventional total 56 minutes
56:00 minutes
TOTAL TIME

The total time required for the entire under - coat repair cycle usin g the con ventional system is about 56:00 minutes.
 
youtube facebook
News
Carlass visit Symach
November 2017
READ
Carglass® Executives and Customers Visit Symach’s State-of-the-Art Facility in Italy
SYMACH System Fixline
October 2017
READ
Symach’s FixLine System Installed in New State-of-the-art Body Shop in Belgium
Gary Lyons SYMACH
September 2017
READ
Gary Lyons New SYMACH Project Manager North America
Future Center Symach
September 2017
READ
Symach’s Future Center in Bologna, it hosted the Companies: AKZO NOBEL, BASF and The Sherwin-Williams
European Auto Body
July 2017
READ
Another successful Symach project: European Auto Body
CSN Blue Mountain Collision
July 2017
READ
CSN Blue Mountain Collision opened a 10,700-square-foot Symach equipped shop in Collingwood, Ontario, Canada
Nace Automechanika
July 2017
READ
SYMACH to Host Info Session at NACE Automechanika
news
May 2017
READ
CSN Blue Mountain Collision in Ontario Builds New Shop with Symach FixLine System
Autopromotec 2017
May 2017
READ
SYMACH to Host Open House During AUTOPROMOTEC
© 2016 | Symach srl All Rights Reserved
Back to top